Please use this identifier to cite or link to this item:
http://localhost:8080/xmlui/handle/123456789/5429| Title: | Investigating Causes of Delay in Ethiopian Dry Port Construction Projects (A Case Study on Ethiopian shipping & Logistics Dry Port Construction Projects) |
| Authors: | Tesfaye Hagos |
| Keywords: | Construction Management - Thesis |
| Issue Date: | 2024 |
| Publisher: | Addis College |
| URI: | http://localhost:8080/xmlui/handle/123456789/5429 |
| Appears in Collections: | THESIS |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Investigating Causes of Delay in Ethiopian Dry Port.pdf | 1.64 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.