Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/5462
Title: THE EFFECT OF TIME EXTENSION ON COST OVERRUN; IN CASE OF SELECTED ROAD PROJECT IN ADDIS ABABA
Authors: BIRHANU HAILU.
Keywords: Construction Management - Thesis
Issue Date: 2024
Publisher: Addis College
URI: http://localhost:8080/xmlui/handle/123456789/5462
Appears in Collections:THESIS

Files in This Item:
File Description SizeFormat 
THE EFFECT OF TIME EXTENSION ON COST OVERRUN.pdf1.11 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.