Please use this identifier to cite or link to this item:
http://localhost:8080/xmlui/handle/123456789/5462| Title: | THE EFFECT OF TIME EXTENSION ON COST OVERRUN; IN CASE OF SELECTED ROAD PROJECT IN ADDIS ABABA |
| Authors: | BIRHANU HAILU. |
| Keywords: | Construction Management - Thesis |
| Issue Date: | 2024 |
| Publisher: | Addis College |
| URI: | http://localhost:8080/xmlui/handle/123456789/5462 |
| Appears in Collections: | THESIS |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| THE EFFECT OF TIME EXTENSION ON COST OVERRUN.pdf | 1.11 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.